Enable High Contrast Mode
Disable High Contrast Mode
December 13, 2023
Our team rehabilitated the parking lot and sidewalks at the Rondout Savings Bank’s Ulster Ave Branch. The work included full depth asphalt removal, selective full depth subbase and paving fabric installation for stabilization, concrete sidewalk removal & replacement, drive through islands & curb removal and replacement, full depth asphalt paving and new pavement markings.