June 6, 2022
This contract was for the replacement of a septic system at DDSO residence in Valatie, NY. The existing system had failed, requiring the facility to frequently pump the septic tank. Our team installed and new septic system with 14 laterals, a septic tank, a pump tank with pumps, and a distribution box. Following the installation the site was restored to original condition with topsoil, seed and mulch. This project was managed by Tom Petersen & Rian Baker in the office and Field Superintendent Matt Boice. Our contract amount was $180,000.00.