November 24, 2025
This work was performed as a subcontractor to PCC Contracting who held a general contract with New York State Office of Parks for the Building Rehab and Drainage Improvement project. Our team removed the existing landscaping and the drainage drip edge along the Senate Museum and installed a river rock drip edge with perforated drainage piping and Nyloplast basins. During the second phase of this project our team installed a 10’ deep x 17’ wide x 40’ long ADS infiltrator basin field to collect the roof runoff from the Senate house gutters. Bellamy Construction performed two directional bores to install HDPE drainage piping beneath historically sensitive areas. Our team intercepted the directional drilled pipe to install Nyloplast basins that tied to the buildings gutter leaders. This project completed in Fall of 2025 was managed by Rian Baker and Superintendent Matt Boice. This project was valued at $333,000.00.