October 3, 2025
This contract with the Town of Ulster was for construction of a new 443,000-gallon glass lined steel bolted water storage tank. This project included, removal of the existing concrete foundation and waterline, site grading, rock excavation, water line installation, and construction of the new glass lined steel bolted storage tank. The design and construction of the new water tank was performed by Statewide Aquastore. This project was completed in Spring 2025 and was managed by Tom Petersen and Rian Baker. The field Superintendent was Barry Kaiser. This project was valued at $1,175,000.00.